Preventive Maintenance Contract(PMC)
 Home
 About Us
 Corporate Care
 Recognition
 International Business
 News
 Careers
 Lifespace Store Locator
 Dealer Locator
 What's New
 Contact Us
 Sitemap


 

BENEFITS of the Preventive Maintenance Contract (PMC)

 

 
  1. Helps you in minimising the maintenance & operation cost with minimum downtime of your Godrej machine by planned and proper periodic maintenance.

  2. You can avail concessional rate for spares which are required to be ordered and kept in stock.

  3. Concessional service charges compared to one time call.

  4. Attention by skilled and trained technicians who will attend to your Godrej machine, suggest timely remedial measures and recommend suitable spare parts to be procured if any. This will help you in proper maintenance of your machine at minimal cost.

 

PREVENTIVE MAINTENANCE SCHEDULE for
Godrej Power Press & Mechanical Press Brake

 

 
  1. Lubrication

    1. Flush out and clean the lubricating system and refill with fresh oil.
    2. Check the oil lines, oil holes and oil groves for clogging up.
    3. Drain the oil from enclosed gear box and fill fresh oil to the specified level.
     

  2. General

    Check

    1. Left-to-right and front-to-back level of the machine and correct, if necessary.
    2. Clearance in the gib guides if excessive, adjust.
    3. Adjust the belts for tightness.
    4. Condition of brake liner & replace if required and brake adjustment.
    5. Tripping linkage / EPT system
    6. Counter balance assembly
    7. Clutch assembly for liner wear and replace liner if required.
    8. Electrical contacts and connections and rectify where required.
    9. P B tooling for condition & recommend.
    10. Productivity improvement necessity and recommend any accessories / upgrading.

 

PREVENTIVE MAINTENANCE SCHEDULE for
Godrej Mechanical Shear

 

 
  1.  Lubrication

    1. Flush out and clean the lubricating system and refill with fresh oil
    2. Check the oil lines, oil holes and oil grooves for clogging up.
    3. Drain the oil from the enclosed gear box and fill fresh oil to the specified level.
    4. Motor bearings (with grease)
    5. Drain and refill oil in hold down box.
     

  2. General

    Check

    1. Left-to-right and front-to-back level of the machine and correct, if required.
    2. Clearance in the gib guides if excessive, adjust.
    3. Adjust back gauge driving and indicator chains.
    4. Adjust belts for tightness.
    5. Condition of brake liner and brake adjustment.
    6. Knife clearance and reset, if required.
    7. Tripping linkage
    8. Counter balance assemblies
    9. Hold down units for leakage
    10. Electrical contacts and connections and rectify where required.
    11. Blade sharpness and recommend grinding / spare blade.

 

TERMS & CONDITIONS FOR PMC

 
  1. Duration of this agreement will be ONE YEAR w.e.f. date of receiving full earnest money.

  2. Machines is expected to be in good working condition while accepting the contract. In case there is a breakdown then the machine will be attended first at cost and the PMC will be separately discussed.

  3. In order to ensure minimum downtime the customer is advised to order and stock all the required spares for Preventive Maintenance Contract (PMC) in advance. The list of spares is available on the net for standard models or can be requested. In any case our representative will hand over such list while finalising the contract.

  4. All recommended lubricants, oils, tools, etc., are in the scope of the customer. In addition, we request the customer to provide basic help to our technician like the material handling equipment and semiskilled labour etc.

  5. In order to get the best results ,it is obvious that the customer should carry out the daily maintenance as per the guidelines given in manual.

  6.  Preventive maintenance shall be carried out as per the laid down format enclosed. However we will be open to carry out any job over and above the scope of preventive maintenance at an extra cost.

  7.  The customer is expected to keep available the said machine / s or other facilities . In case of any difficulty the date should be changed in advance by mutual consent. Alternatively the visit will be treated as completed.

  8. It is possible that machine covered under the plan can breakdown. Our services will in any case be available in such event at an extra cost.

  9. We can also undertake overhaul of subassemblies / assemblies at an extra cost.

  10. We shall be entitled to terminate the agreement in the event of change of ownership or location of the said machine.

  11. Either party shall be entitled to terminate the agreement at any time giving one month’s advance notice, and the customer shall be entitled to refund of the advance on pro-rata basis for the unexpired period of the agreement.

  12. If prior to offering the machine for PMC the machine is offered for overhauling, a lumpsum quotation towards service charges will be offered with concessional service charges as above.

 

 

Fill the below mentioned form for Preventive Maintenance Contract (PMC).
*** Essential Information to give prompt response for quotation-mandatory

Company Name

 ***
First Name  ***
Middle Name
Last Name  ***
Type and Make of machine


Others


 ***
Address   ***  
City   ***
Pincode  ***
Telephone Number  ***  
Email Id   ***
 

 


Mode of Payment can be by Cheque/ DD in Favour of Godrej & Boyce Mfg. Co. Ltd

 
 

Copyright © 2007. Godrej & Boyce Mfg. Co. Ltd.
Privacy Policy | Terms & conditions | Designed, Developed & Maintained by: Godrej Infotech Limited
This site is best viewed in I.E. with a 800 x 600 monitor resolution