| |
BENEFITS of the Preventive Maintenance Contract (PMC)
|
| |
-
Helps
you in minimising the maintenance & operation cost with minimum downtime of
your Godrej machine by planned and proper periodic maintenance.
-
You
can avail concessional rate for spares which are required to be ordered and
kept in stock.
-
Concessional
service charges compared to one time call.
-
Attention
by skilled and trained technicians who will attend to your Godrej machine,
suggest timely remedial measures and recommend suitable spare parts to be
procured if any. This will help you in proper maintenance of your machine at
minimal cost.
|
| |
PREVENTIVE MAINTENANCE SCHEDULE for
Godrej Power Press & Mechanical Press Brake
|
| |
-
Lubrication
1. Flush out and clean the lubricating system and refill with fresh oil.
2. Check the oil lines, oil holes and oil groves for clogging up.
3. Drain the oil from enclosed gear box and fill fresh oil to the specified
level.
-
General
Check
1. Left-to-right and front-to-back level of the machine and correct, if
necessary.
2. Clearance in the gib guides if excessive, adjust.
3. Adjust the belts for tightness.
4. Condition of brake liner & replace if required and brake adjustment.
5. Tripping linkage / EPT system
6. Counter balance assembly
7. Clutch assembly for liner wear and replace liner if required.
8. Electrical contacts and connections and rectify where required.
9. P B tooling for condition & recommend.
10. Productivity improvement necessity and recommend any accessories /
upgrading.
|
| |
PREVENTIVE MAINTENANCE SCHEDULE for
Godrej Mechanical Shear
|
| |
-
Lubrication
1. Flush out and clean the lubricating system and refill with fresh oil
2. Check the oil lines, oil holes and oil grooves for clogging up.
3. Drain the oil from the enclosed gear box and fill fresh oil to the specified
level.
4. Motor bearings (with grease)
5. Drain and refill oil in hold down box.
-
General
Check
1. Left-to-right and front-to-back level of the machine and correct, if
required.
2. Clearance in the gib guides if excessive, adjust.
3. Adjust back gauge driving and indicator chains.
4. Adjust belts for tightness.
5. Condition of brake liner and brake adjustment.
6. Knife clearance and reset, if required.
7. Tripping linkage
8. Counter balance assemblies
9. Hold down units for leakage
10. Electrical contacts and connections and rectify where required.
11. Blade sharpness and recommend grinding / spare blade.
|
| |
TERMS & CONDITIONS FOR PMC
|
| |
-
Duration
of this agreement will be ONE YEAR w.e.f. date of receiving full earnest money.
-
Machines
is expected to be in good working condition while accepting the contract. In
case there is a breakdown then the machine will be attended first at cost and
the PMC will be separately discussed.
-
In
order to ensure minimum downtime the customer is advised to order and stock all
the required spares for Preventive Maintenance Contract (PMC) in advance. The
list of spares is available on the net for standard models or can be requested.
In any case our representative will hand over such list while finalising the
contract.
-
All
recommended lubricants, oils, tools, etc., are in the scope of the customer. In
addition, we request the customer to provide basic help to our technician like
the material handling equipment and semiskilled labour etc.
-
In
order to get the best results ,it is obvious that the customer should carry out
the daily maintenance as per the guidelines given in manual.
-
Preventive
maintenance shall be carried out as per the laid down format enclosed. However
we will be open to carry out any job over and above the scope of preventive
maintenance at an extra cost.
-
The
customer is expected to keep available the said machine / s or other facilities
. In case of any difficulty the date should be changed in advance by mutual
consent. Alternatively the visit will be treated as completed.
-
It
is possible that machine covered under the plan can breakdown. Our services
will in any case be available in such event at an extra cost.
-
We
can also undertake overhaul of subassemblies / assemblies at an extra cost.
-
We
shall be entitled to terminate the agreement in the event of change of
ownership or location of the said machine.
-
Either
party shall be entitled to terminate the agreement at any time giving one
month’s advance notice, and the customer shall be entitled to refund of the
advance on pro-rata basis for the unexpired period of the agreement.
-
If
prior to offering the machine for PMC the machine is offered for overhauling, a
lumpsum quotation towards service charges will be offered with concessional
service charges as above.
|
| |
Fill the below mentioned form for Preventive Maintenance Contract
(PMC).
*** Essential Information to give prompt response for
quotation-mandatory
|
| |
Mode of Payment can be by Cheque/ DD in Favour of Godrej & Boyce Mfg. Co.
Ltd
|